Alterations and road works

To keep the cycling route network in tip-top shape, work has to be executed now and then, or adjustments are necessary. Here you will find an overview of all diversions and alterations.

Last updated on September 28, 2020

Corona measure: One-way traffic at Cycling through Water
To be able to keep social distancing at the Cycling through Water path, only one-way traffic is allowed for cyclists. When you arrive via junctions 95 and 92, you will be routed on a detour for 300 meters. Pedestrians can still walk in both directions. These measures apply until further notice.

Corona measure: Ferries across the Meuse river
Wearing a mouth mask is mandatory if you take the ferry, as social distancing is not always possible. In case you forget to carry a mask, you can purchase one on the ferry. By paying the exact amount, physical contact with the ferryman is limited as much as possible. When queuing on the ferry ramps, you have to keep a distance of 1.5 meters.

Lummen bridge works: cycle junctions 306-319
Until the end of March 2021, the bridge over the Albert Canal in Lummen, as well as the towpaths on both banks under the bridge, will be blocked. This way the path between junctions 306 and 319 will be inaccessible, but you can make a detour (16 km longer) by following the surrounding junctions 304-303-312-318.

Kaart van afsluiting werken Lummen